求翻译:a.张拉结束并压浆后,待砂浆强度达到设计强度后,方可解除临时支座。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
a.张拉结束并压浆后,待砂浆强度达到设计强度后,方可解除临时支座。
问题补充:

  • 匿名
2013-05-23 12:21:38
a. tensioning and grouting after the end until it reaches its design strength of the mortar strength only after the lifting of the temporary supports.
  • 匿名
2013-05-23 12:23:18
chang, a conclusion and threshed after mortar strength reached the design strength after the interim support block lifted.
  • 匿名
2013-05-23 12:24:58
After a. opens pulls the conclusion and the mud jacking, after waits the mortar intensity to achieve the design intensity, only then relieves the temporary support.
  • 匿名
2013-05-23 12:26:38
A. tension ended and after grouting, and after it reaches the design strength of mortar strength in order to lift the temporary bearing.
  • 匿名
2013-05-23 12:28:18
a. tensioning and grouting after the end until it reaches its design strength of the mortar strength only after the lifting of the temporary supports.
 
 