当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The provision, operation and maintenance of sanitary systems, industrial systems, storm drainage and utility sewage systems for Contractor's temporary facilities and construction area sanitary facilities is the responsibility of Contractor, including collection, holding, processing and disposal.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The provision, operation and maintenance of sanitary systems, industrial systems, storm drainage and utility sewage systems for Contractor's temporary facilities and construction area sanitary facilities is the responsibility of Contractor, including collection, holding, processing and disposal.
问题补充:

  • 匿名
2013-05-23 12:21:38
的规定,卫生系统,工业系统,排涝和实用的污水处理系统的操作和维护承包商的临时设施,建筑面积卫生设施是承包商的责任,包括收集,持有,处理和处置。
  • 匿名
2013-05-23 12:23:18
这项规定,操作和维护卫生系统、工业系统、雨水管道和实用程序排污系统承包商的临时设施和卫生设施建设区的承建商的责任,包括收集、持有、处理和处置。
  • 匿名
2013-05-23 12:24:58
有益健康的系统、工业系统、风暴排水设备和公共事业下水道系统供应、运行和维护为承包商的临时设施和建筑区域有益健康的设施是承包商的责任,包括汇集,藏品,处理和处置。
  • 匿名
2013-05-23 12:26:38
提供、 操作和维护的卫生系统、 工业系统、 风暴、 排水和实用程序污水处理系统承包商的临时设施和卫生设施建设面积是承建商,包括收集、 持有、 处理及处置的责任。
  • 匿名
2013-05-23 12:28:18
对卫生的系统,工业系统,风暴排水和对于承包商的临时便利和建筑业地区公共厕所设施的实用的污水系统的条款,操作和维护是承包商的责任,包括收集,财产,处理和处理。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭