当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:4、气路管道安装完毕在接通用气设备的气路单元之前,应通压缩空气将管内异物吹出,是什么意思?

待解决 悬赏分:1 - 离问题结束还有
4、气路管道安装完毕在接通用气设备的气路单元之前,应通压缩空气将管内异物吹出,
问题补充:

  • 匿名
2013-05-23 12:21:38
4, the gas line pipes installed before then the universal gas equipment, gas path unit, should pass the compressed air tube foreign body blow
  • 匿名
2013-05-23 12:23:18
4, gas supply line has been installed in a common air device before the air unit, the compressed air is blown out, foreign objects
  • 匿名
2013-05-23 12:24:58
4th, the air course pipelining finished in the connection with was mad equipment in front of air course unit, should pass the compressed air the foreign matter to blow out the tube in,
  • 匿名
2013-05-23 12:26:38
4, gas pipes installed before connecting gas equipment gas unit, should pass the compressed air tube foreign body blow out,
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭