求翻译:用模糊理论可描述为:某道工序的估计工期M如果不大于T,也就是在小于等于U时间内完工的话,那么我们就说这一可能性为R。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
用模糊理论可描述为:某道工序的估计工期M如果不大于T,也就是在小于等于U时间内完工的话,那么我们就说这一可能性为R。
问题补充:

  • 匿名
2013-05-23 12:21:38
Fuzzy theory can be described as: the estimated duration of the process m is not greater than t is less than or equal to u time completion, then we say that possibility is r.
  • 匿名
2013-05-23 12:23:18
A vague theory can be described as a process: the estimated construction period T M if not more than, that is less than or equal to U completion in time, then we say that the possibility of R.
  • 匿名
2013-05-23 12:24:58
May describe with the fuzzy theory is: If some working procedure estimate time limit for a project M is not bigger than T, also is in is smaller than was equal to in the U time finishes speech, then we said this possibility is R.
  • 匿名
2013-05-23 12:26:38
Using fuzzy theory can be described as: a process estimated m if not greater than t, which is less than or equal to u finished within the time, then we say that this possibility is r.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 