当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:钢筋在加工场内集中下料,统一弯制成型,用吊车配合在墩顶组装绑扎成型,盖梁施工时注意预埋防震挡块、支座垫石钢筋,当防震挡块钢筋与盖梁钢筋发生干扰时,适当调整挡块钢筋。钢筋的加工及安装严格按照桥涵施工技术规范和图纸的设计要求进行施工。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
钢筋在加工场内集中下料,统一弯制成型,用吊车配合在墩顶组装绑扎成型,盖梁施工时注意预埋防震挡块、支座垫石钢筋,当防震挡块钢筋与盖梁钢筋发生干扰时,适当调整挡块钢筋。钢筋的加工及安装严格按照桥涵施工技术规范和图纸的设计要求进行施工。
问题补充:

  • 匿名
2013-05-23 12:21:38
Concentration in the processing inside steel cutting, bending made uniform type, with the crane at the pier top with banding molding assembly, capping beam construction note embedded shock block, stone reinforced seat support, when the shock stop beam reinforced with steel cover interference occurs,
  • 匿名
2013-05-23 12:23:18
steel mills in the concentration in the uniform bends, and cable cars are made in conjunction with Tun-tied molding, assembled by Attention LEUNG when construction pre-buried seismic block block, support cushions shek steel reinforcement bars, when earthquakes with irresistible piece Leung steel cov
  • 匿名
2013-05-23 12:24:58
The steel bar concentrates the yummy treats in the manufacturing place, unifies makes curved, goes against with the crane coordination when the pillar the assembly binds the formation, Ge the Liang construction pays attention buries in advance quakeproof keeps off the block, the support bedstone ste
  • 匿名
2013-05-23 12:26:38
Steel focuses the material within the processing factories, made of uniform bending, crane tie in Assembly binding on Pier top molding, capping beam construction notice template embedded vibration block, bearing steel, when earthquake prevention block reinforcement and plate beam reinforcement when
  • 匿名
2013-05-23 12:28:18
Concentration in the processing inside steel cutting, bending made uniform type, with the crane at the pier top with banding molding assembly, capping beam construction note embedded shock block, stone reinforced seat support, when the shock stop beam reinforced with steel cover interference occurs,
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭