当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:本标段盖梁主要为双柱墩式盖梁施工,薄壁墩为独柱墩盖梁,要从厂家定制包箍,并在柱身上设置预埋件。盖梁施工的支撑方式采用抱箍配合工字钢组合加固的方式进行施工,上铺两根工字钢支撑模板和间距均匀的木方。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本标段盖梁主要为双柱墩式盖梁施工,薄壁墩为独柱墩盖梁,要从厂家定制包箍,并在柱身上设置预埋件。盖梁施工的支撑方式采用抱箍配合工字钢组合加固的方式进行施工,上铺两根工字钢支撑模板和间距均匀的木方。
问题补充:

  • 匿名
2013-05-23 12:21:38
The tenders cover the main beam for the double-column pier cap beam-type construction, thin as a single column pier pier cap beams, from manufacturers to customize the package hoop, and set embedded in the column body parts. Capping beam construction method using the support beam with the combinatio
  • 匿名
2013-05-23 12:23:18
Mr Leung mainly covers the standard paragraph style covers for double-dolphins Leung construction, thin-walled Tun as a single pillar covers customization package from the manufacturer to Mr LEUNG, grabbed onto the pillars, and set up pre-buried. Leung cover construction method of supporting our por
  • 匿名
2013-05-23 12:24:58
This sign Duan Gailiang mainly constructs for double stump type Ge Liang, the thin wall pillar for alone stump Ge Liang, must have custom-made the shroud ring from the factory, and establishes on the shaft buries in advance.Ge Liang constructs the support way uses holds the band coordination I-steel
  • 匿名
2013-05-23 12:26:38
This section of Cap-mainly for double column Pier capping beam construction, thin-wall piers for single column Pier cap beams, from factory customization package hoops, and upon column settings embedded parts. Bent Cap construction of support adopted hoop facilitate construction of I-steel composite
  • 匿名
2013-05-23 12:28:18
The tenders cover the main beam for the double-column pier cap beam-type construction, thin as a single column pier pier cap beams, from manufacturers to customize the package hoop, and set embedded in the column body parts. Capping beam construction method using the support beam with the combinatio
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭