当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:同时具备220KV以下变电站的承建,承修,承试,以及330KV变电站的承装资质。目前,所承建的电网工程已达40多座。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
同时具备220KV以下变电站的承建,承修,承试,以及330KV变电站的承装资质。目前,所承建的电网工程已达40多座。
问题补充:

  • 匿名
2013-05-23 12:21:38
Have the of 220kv following substation construction, for repair, for your trial, and 330kv substations for installing qualified. At present, the construction of the power grid project has reached more than 40 seats.
  • 匿名
2013-05-23 12:23:18
With the substation of 220 KV contractors, contractors, contractors, and the substation 330 KV load. At present, the grid projects have more than 40 seats.
  • 匿名
2013-05-23 12:24:58
Simultaneously has below 220KV the transformer substation construction, accepts for repair, receives tries, as well as the 330KV transformer substation receives installs the intelligence.At present, undertakes construction the electrical network project has reached more than 40 places.
  • 匿名
2013-05-23 12:26:38
Both of the 220KV substation construction, repairing, testing, as well as the 330KV substation installation qualification. At present, more than the grid works contractors has reached more than 40 seats.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭