当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Contractor is responsible for the management of the interfaces with the NTDC with regard to the design and installation of the Employers Interconnection facilities up to the interconnection point where they link to the Energy Purchasers Interconnection Facilities, this includes obtaining the required information fr是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Contractor is responsible for the management of the interfaces with the NTDC with regard to the design and installation of the Employers Interconnection facilities up to the interconnection point where they link to the Energy Purchasers Interconnection Facilities, this includes obtaining the required information fr
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
承包商负责管理该接口与ntdc提供有关设计和安装的互连设施的雇主的互连点链接在他们的能源买家互连设施,这包括获取所需信息的网格运算符。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
该承建商是负责管理的设计和安装到哪里它们链接到能源买家互连设施的互连点雇主互连设施 NTDC 接口,这包括从网格运算符获取所需的信息
  • 匿名
2013-05-23 12:28:18
承包商关于雇主的作品和安装设备利用 NTDC 对界面的管理负责互连连接设施向上到他们联合起来到能量购买者互连连接设施的互连连接点,这包括从格子操作员获取所需信息
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭