求翻译:墩柱在向上施工过程中,临时支撑高度方向每5米左右设置一道,临时支撑布置在墩柱内与主筋焊接的预埋钢板上,以保证塔吊的稳定性。墩柱系梁施工完毕后,型钢支撑拆除,预埋钢板外表面刷涂防锈漆防腐。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
墩柱在向上施工过程中,临时支撑高度方向每5米左右设置一道,临时支撑布置在墩柱内与主筋焊接的预埋钢板上,以保证塔吊的稳定性。墩柱系梁施工完毕后,型钢支撑拆除,预埋钢板外表面刷涂防锈漆防腐。
问题补充:

  • 匿名
2013-05-23 12:21:38
Pier in the upward course of construction, temporary support to a high degree of direction every 5 meters to set a temporary support arrangement in the piers within the embedded steel reinforcement welded on, to ensure crane stability. Pier tie beam construction is completed, remove the steel suppor
  • 匿名
2013-05-23 12:23:18
Pillar construction process in upward direction, temporary support every 5 meters height set up a temporary support, arranged in the main pillar in the pre-buried steel tendons welding in order to guarantee the stability of towers. Pillar, after Mr Leung construction, demolition, dilatant support pr
  • 匿名
2013-05-23 12:24:58
The foot stall in the upward construction process, about the temporary support direction every 5 meters establishes highly together, the temporary support arrangement buries on in advance the steel plate in the foot stall with the main reinforcement welding, guarantees the tower crane the stability.
  • 匿名
2013-05-23 12:26:38
During construction of pillars in the up, temporary support every 5 meters in height direction setting, temporary support arrangement within the piers and the embedding of reinforcing bar welding on steel plate in order to ensure the stability of tower crane. Pier tie beams construction has been com
  • 匿名
2013-05-23 12:28:18
Pier in the upward course of construction, temporary support to a high degree of direction every 5 meters to set a temporary support arrangement in the piers within the embedded steel reinforcement welded on, to ensure crane stability. Pier tie beam construction is completed, remove the steel suppor
 
 