当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:本项目的空心薄壁墩采用最大自升高度为160米的80T-M附着式塔吊,塔吊设置在主墩的承台上,施工过程中按塔吊的附着要求设置扶臂。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本项目的空心薄壁墩采用最大自升高度为160米的80T-M附着式塔吊,塔吊设置在主墩的承台上,施工过程中按塔吊的附着要求设置扶臂。
问题补充:

  • 匿名
2013-05-23 12:21:38
The project uses the largest hollow thin-wall pier height of 160 meters from the rise of 80T-M attached tower crane, tower crane to set the stage bearing the main pier, the construction process requirements set by the tower crane supporting arm attached.
  • 匿名
2013-05-23 12:23:18
The project's hollow thin-walled mounds rise using the largest since the height of 160 meters - M T possessed 80 type tower crane, tower crane settings in the main embankment of the podium and throughout the course of the construction project of a tower crane arm Rotary Club fixtures set requirement
  • 匿名
2013-05-23 12:24:58
This project hollow thin wall pillar uses from the ascent is most greatly 160 meter 80T-M attached type tower crane, the tower crane establishes in the host pillar receives on Taiwan, in the construction process adheres to stick cohere the request establishment according to the tower crane to hold t
  • 匿名
2013-05-23 12:26:38
Thin-walled hollow pier of this project 80T-M maximum lifting height of 160 metres of attached tower crane, tower crane set bearing platform of main piers, construction according to requirements of tower crane attachment settings hold the arm in the process.
  • 匿名
2013-05-23 12:28:18
The project uses the largest hollow thin-wall pier height of 160 meters from the rise of 80T-M attached tower crane, tower crane to set the stage bearing the main pier, the construction process requirements set by the tower crane supporting arm attached.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭