当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Contractor shall provide for all curing of concrete in accordance with specifications, supply and install all sleeves and pockets along with methods and materials to hold them securely in place during concrete placement, water stop, removal of form work, any and all required surface treatment (concrete rubbing) after c是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Contractor shall provide for all curing of concrete in accordance with specifications, supply and install all sleeves and pockets along with methods and materials to hold them securely in place during concrete placement, water stop, removal of form work, any and all required surface treatment (concrete rubbing) after c
问题补充:

  • 匿名
2013-05-23 12:21:38
承包商应提供所有混凝土养护,按照规范,供应及安装方法和材料的袖子和口袋里举行安全的地方,他们在混凝土浇筑,止水带,去除形式的工作,任何及所有必要的表面处理(混凝土摩擦)铸造和搬迁的形式,扩大联合高架砖切割需要的地方,以防止混凝土开裂后,所有的抽样和测试气瓶的要求。
  • 匿名
2013-05-23 12:23:18
承建商须提供所有的固化的具体规格、供应和安装所有套袋与方法和材料,以使它们保持安全地固定在具体位置,水停止,拆卸工作的形式,任何和所有所需表面处理(具体擦拭)铸造后的形式和拆卸,膨胀节切割在提升砖需要防止开裂的水泥地面,所有取样和测试所需的油缸。
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
承包商须提供所有符合规格混凝土养护、 供应和安装所有的袖子和方法和材料,以让他们安全地在过程中混凝土浇筑、 水停止、 去除的形式工作,任何及所有需要经过表面处理 (混凝土摩擦) 铸造和形式,去除地方的口袋中高架伸缩缝的切割板凡需防止混凝土裂缝所有的抽样和测试要
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭