当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:All concrete works not excluded elsewhere are to be performed as part of this contract. The requirements and methodology for installation are described in detail in the specifications. However, for reference the scope will specifically include, but not be limited to, anchor bolts, concrete structures, concrete sample t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
All concrete works not excluded elsewhere are to be performed as part of this contract. The requirements and methodology for installation are described in detail in the specifications. However, for reference the scope will specifically include, but not be limited to, anchor bolts, concrete structures, concrete sample t
问题补充:

  • 匿名
2013-05-23 12:21:38
所有具体工作,不排除在其他地方将被作为本合同的一部分执行。安装的要求和方法进行了详细介绍,在规格内。然而,以供参考的范围具体包括,但不仅限于,锚定螺栓,混凝土结构,混凝土样本测试和实验报告,床上用品,模板,钢筋,螺纹钢,嵌入式项目,销,混凝土,壕沟,光栅盖,地砖,支持设备,封口机,整平垫片和灌浆。
  • 匿名
2013-05-23 12:23:18
所有混凝土工程是在其他地方,不排除是本合同的一部分。 这要求和方法进行了详细的安装技术规范。 但是,对于参考范围将特别包括,但不限于,地脚螺栓,混凝土结构,具体抽样测试和实验报告、寝具、木模板、加固、钢筋、嵌入式项目,定位销,具体、壕沟、格栅盖、砖、设备支持、密封剂、调平垫片和灌浆。
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
不排除其它地方的所有混凝土工程是要执行作为本合同的一部分。规范中详细描述的要求和安装方法。不过,参考范围将具体包括,但不是只限于锚螺栓、 混凝土结构、 混凝土样本测试和实验室
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭