当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:钻孔桩钢筋笼在车间分段制作,运输到各工点安装,钢筋笼所用钢材须有产品合格证和现场抽检复查资料,满足混凝土工程施工质量验收标准要求。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
钻孔桩钢筋笼在车间分段制作,运输到各工点安装,钢筋笼所用钢材须有产品合格证和现场抽检复查资料,满足混凝土工程施工质量验收标准要求。
问题补充:

  • 匿名
2013-05-23 12:21:38
Bored pile reinforcement cage section in the workshop production, transportation to various work sites to install, the steel reinforcement cage shall be used for product certification and on-site review of sampling data, the quality of concrete construction to meet the acceptance criteria requiremen
  • 匿名
2013-05-23 12:23:18
Bored Piles steel cages in the workshop produced sub-paragraph and transported to the various industrial and installation that is used for steel reinforcement cages steel shall have a Certificate of Product Quality and on-the-spot sample testing review information, meet concrete construction quality
  • 匿名
2013-05-23 12:24:58
The drill hole pile reinforcing cage in the workshop partition manufacture, transports to various labor installment, the reinforcing cage uses the steel products to have to have the product certificate and the scene spot-check reexamination material, satisfies the concrete project construction quali
  • 匿名
2013-05-23 12:26:38
Bored pile reinforcement cages in the workshop block fabrication, transport to the point installation, reinforcement cages used by the steel shall have a certificate and field sampling to review material, concrete engineering construction quality approval standard requirements are met.
  • 匿名
2013-05-23 12:28:18
Bored pile reinforcement cage section in the workshop production, transportation to various work sites to install, the steel reinforcement cage shall be used for product certification and on-site review of sampling data, the quality of concrete construction to meet the acceptance criteria requiremen
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭