求翻译:采用适当的器具及时检查孔的中心位置、孔径、孔深、倾斜度、孔内沉淀层厚度,各项技术指标超过允许偏差时,要及时研究处理。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
采用适当的器具及时检查孔的中心位置、孔径、孔深、倾斜度、孔内沉淀层厚度,各项技术指标超过允许偏差时,要及时研究处理。
问题补充:

  • 匿名
2013-05-23 12:21:38
Timely use of appropriate equipment inspection center of the hole, hole, hole depth, slope, sediment thickness hole, the technical indicators exceed the allowable deviation, a timely study of deal.
  • 匿名
2013-05-23 12:23:18
Use of appropriate apparatus and timely inspection holes of the center location, aperture, depth, angle, holes in the technical indicators, sediment thickness exceeding allowable deviation, it is necessary to timely research.
  • 匿名
2013-05-23 12:24:58
Uses the suitable appliance prompt inspection hole in the central position, the aperture, the depth of hole, the gradient, the hole bed of precipitation thickness, when each technical specification surpasses the allowable deviation, must study processing promptly.
  • 匿名
2013-05-23 12:26:38
The use of appropriate equipment inspection hole Center location in time, Aperture, hole depth, tilt, holes in the sediment layer thickness, the technological index exceeded the allowed deviation, to study in a timely manner.
  • 匿名
2013-05-23 12:28:18
Timely use of appropriate equipment inspection center of the hole, hole, hole depth, slope, sediment thickness hole, the technical indicators exceed the allowable deviation, a timely study of deal.
 
 