当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:3-5月长马星骋预热期的预算及投放时间有限。但如上表所示,项目整体的成本属于常规水平偏上。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
3-5月长马星骋预热期的预算及投放时间有限。但如上表所示,项目整体的成本属于常规水平偏上。
问题补充:

  • 匿名
2013-05-23 12:21:38
March to May, Mah Sing Cheng warm-up of the budget and running time is limited. As the table shows, the cost of the project as a whole belongs to the upper normal level.
  • 匿名
2013-05-23 12:23:18
3 - 5 months long warm-up period and the star of the budget and allocate time is limited. However, as shown in the table below, the project's overall cost is part of the normal level.
  • 匿名
2013-05-23 12:24:58
3- in May long Ma Xingcheng the preheating time budget and the delivery time are limited.But like on the table shows, the project whole cost belongs to the conventional level on.
  • 匿名
2013-05-23 12:26:38
March-May, long Ma Xingcheng limited budget and release time of the warm-up period. But as shown in the above table, costs of the project as a whole is above normal levels.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭