当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:公司具备同事承担5至7坐大型火力发电厂整体土建工程、十余座中小型电厂、多个高层民用建筑工程,5至8个330KV及以上变电站土建安装工程、以及超大型冷却塔、风电、太阳能光伏发电、余热发电等施工能力是什么意思?

待解决 悬赏分:1 - 离问题结束还有
公司具备同事承担5至7坐大型火力发电厂整体土建工程、十余座中小型电厂、多个高层民用建筑工程,5至8个330KV及以上变电站土建安装工程、以及超大型冷却塔、风电、太阳能光伏发电、余热发电等施工能力
问题补充:

  • 匿名
2013-05-23 12:21:38
Company with my colleagues take 5-7 overall civil works to take the large-scale thermal power plant, Shi Yuzuo small and medium-sized power plant, the number of senior civil engineering, 5-8 330kv and above transformer substation construction installation works, as well as large cooling towers, wind
  • 匿名
2013-05-23 12:23:18
A colleague sat for 5 to 7 large thermal power plants overall construction works, and more than 10 small and medium-sized power plants, and multiple high-level civil engineering construction, 5 to 8 330 and above KV substation construction installation works, as well as ultra-large cooling towers, w
  • 匿名
2013-05-23 12:24:58
The company has the colleague to undertake 5 to 7 to sit the large-scale thermal power plant overall civil engineering, ten middle and small scale power plants, many high-level civil construction project, the installation work 5 to 8 330KV and above transformer substation constructions, as well as t
  • 匿名
2013-05-23 12:26:38
Companies have colleagues assumed 5 per cent overall large thermal power plant construction project, more than more than 10 small and medium power plants, senior civil engineering, 5 to 8 more than two 330KV and substation installation project, as well as very large cooling towers, wind power, solar
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭