求翻译:台背基坑在开挖时,首先需放坡1:1.5,然后将坡面挖成宽1.5m,高1m的台阶,保证与路基部分有效衔接。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
台背基坑在开挖时,首先需放坡1:1.5,然后将坡面挖成宽1.5m,高1m的台阶,保证与路基部分有效衔接。
问题补充:

  • 匿名
2013-05-23 12:21:38
Abutment in the excavation pit, the first need Slope 1:1.5, and then dug into the slope width 1.5m, 1m high level to ensure effective interface with the roadbed section.
  • 匿名
2013-05-23 12:23:18
pit digging back in Taiwan, Singapore, and need to be placed first, and then will be 1:1.5 slope surface dug into 1.5m, 1m high and roadbed height in part to ensure effective interface.
  • 匿名
2013-05-23 12:24:58
Taiwan back hole excavated for building foundation when excavating, first must put the slope 1:1.5, then digs the slope face extends 1.5m, high 1m stair, guarantee and roadbed part effective engagement.
  • 匿名
2013-05-23 12:26:38
Back at the time of the excavation of Foundation pit, first required slope 1:1.5 and sloping cut width 1.5M, high 1M level, guarantees and subgrade partially effective convergence.
  • 匿名
2013-05-23 12:28:18
Abutment in the excavation pit, the first need Slope 1:1.5, and then dug into the slope width 1.5m, 1m high level to ensure effective interface with the roadbed section.
 
 