求翻译:过渡段范围内的路基压实度≥96%,当路桥的施工顺序要求采用先填筑路基后施工桥台时,其压实机具要求同一般路基;先施工构造物后填筑路基时,对于大型机具难以压实的地方,应采用小型振动夯或手扶振动压路机薄层夯实或碾压。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
过渡段范围内的路基压实度≥96%,当路桥的施工顺序要求采用先填筑路基后施工桥台时,其压实机具要求同一般路基;先施工构造物后填筑路基时,对于大型机具难以压实的地方,应采用小型振动夯或手扶振动压路机薄层夯实或碾压。
问题补充:

  • 匿名
2013-05-23 12:21:38
Within the scope of the transition section of subgrade compaction ≥ 96%, while road and bridge construction sequence requires construction of the first after abutment embankment filling, its roadbed compaction equipment with the general requirements; after the first construction of structures, when
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
In change-over portion scope roadbed compactness ≥96%, after the highway bridge construction order request uses the reclamation roadbed constructs first the abutment, its compaction machines and tools request with common roadbed; When constructs after first the structure the reclamation roadbed, reg
  • 匿名
2013-05-23 12:26:38
Transition range of roadbed compaction degree ≥ 96%, when bridge's construction order after filling roadbed construction bridge when the subgrade of compaction machines require General; first when subgrade after construction structures, for large machines beyond the compaction of local should be use
  • 匿名
2013-05-23 12:28:18
Within the scope of the transition section of subgrade compaction ≥ 96%, while road and bridge construction sequence requires construction of the first after abutment embankment filling, its roadbed compaction equipment with the general requirements; after the first construction of structures, when
 
 