当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:12,133. The project must take into account the safety of the machine or equipment during the phases of construction, transport, Assembly, installation, adjustment, operation, inspection, cleaning, maintenance, deactivation, disassemble and scrapping through technical references indicated in this standard to be observed是什么意思?

待解决 悬赏分:1 - 离问题结束还有
12,133. The project must take into account the safety of the machine or equipment during the phases of construction, transport, Assembly, installation, adjustment, operation, inspection, cleaning, maintenance, deactivation, disassemble and scrapping through technical references indicated in this standard to be observed
问题补充:

  • 匿名
2013-05-23 12:21:38
  • 匿名
2013-05-23 12:23:18
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭