当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:原定於08月03日开航从SHANGHAI到LONDON的“EVER LAMBENT 0681-006W ”因躲避台风,货物不能装太港,所以中转的货物都漏装到08月10日,截港时间不变。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
原定於08月03日开航从SHANGHAI到LONDON的“EVER LAMBENT 0681-006W ”因躲避台风,货物不能装太港,所以中转的货物都漏装到08月10日,截港时间不变。
问题补充:

  • 匿名
2013-05-23 12:21:38
Originally scheduled for August 3, sailing from shanghai to london ever lambent 0681-006w due to avoid the typhoon, the goods can not be installed too in Hong Kong, the transit of goods missing equipment to the August 10, cut in Hong Kong remains unchanged.
  • 匿名
2013-05-23 12:23:18
Originally scheduled for August 03 to sail from SHANGHAI LONDON EVER LAMBENT 0681 the " - " W 006 typhoons have fled, the goods must not be packed too, because the goods are transferred to leak August 10 Hong Kong time, shot.
  • 匿名
2013-05-23 12:24:58
Decides 8yue03 the date to be open originally from SHANGHAI to LONDON “EVER LAMBENT 0681-006W” because of the avoidance typhoon, the cargo cannot install too the port, therefore the relay cargo all leaks installs to 8yue10 the date, the truncation port time is invariable.
  • 匿名
2013-05-23 12:26:38
Originally scheduled for August 03, sailing from SHANGHAI to LONDON "EVER LAMBENT 0681-006W" escape the typhoons, goods cannot be mounted too in Hong Kong, so the transit of goods are loaded to spill on August 10, latest times of Hong Kong unchanged.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭