当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:During detailed engineering design phase CONTRACTOR shall receive from INTEGRATOR Standards regarding HMI Functions, HMI Screens, HMI configuration standards and Controllers Programming Standards. These documents shall be commented by CONTRACTOR, in order to comply with operational philosophy and with the adopted main 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
During detailed engineering design phase CONTRACTOR shall receive from INTEGRATOR Standards regarding HMI Functions, HMI Screens, HMI configuration standards and Controllers Programming Standards. These documents shall be commented by CONTRACTOR, in order to comply with operational philosophy and with the adopted main
问题补充:

  • 匿名
2013-05-23 12:21:38
  • 匿名
2013-05-23 12:23:18
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭