|
关注:1
2013-05-23 12:21
求翻译:This requisition covers the minimum requirements for the design, materials supply, manufacturing, inspection, commissioning and testing of the SHOP PRIMER LINE to be installed at the shipyard EEP- Estaleiro Enseada do Paraguaçu- to be erected in Maragogipe Municipality in a settlement nominated Ponta do Corujão, Bahia 是什么意思? 待解决
悬赏分:1
- 离问题结束还有
This requisition covers the minimum requirements for the design, materials supply, manufacturing, inspection, commissioning and testing of the SHOP PRIMER LINE to be installed at the shipyard EEP- Estaleiro Enseada do Paraguaçu- to be erected in Maragogipe Municipality in a settlement nominated Ponta do Corujão, Bahia
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区