当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:A fabrication inspection and field operational test schedule must be supplied by the Bidder, for the assessment of equipment performance and suitability, related to specified characteristics and conditions. Such assessment must not, however, be limited to the testes approval described on the schedule supplied.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
A fabrication inspection and field operational test schedule must be supplied by the Bidder, for the assessment of equipment performance and suitability, related to specified characteristics and conditions. Such assessment must not, however, be limited to the testes approval described on the schedule supplied.
问题补充:

  • 匿名
2013-05-23 12:21:38
  • 匿名
2013-05-23 12:23:18
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭