当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Part29设备基础正在绑扎钢筋。发现其和钢构交叉施工存在安全隐患,已经勒令土建停止半天。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Part29设备基础正在绑扎钢筋。发现其和钢构交叉施工存在安全隐患,已经勒令土建停止半天。
问题补充:

  • 匿名
2013-05-23 12:21:38
part29 equipment base is steel banding. Found that there are security risks and cross-Steel construction, has ordered civil stopped half a day.
  • 匿名
2013-05-23 12:23:18
Device 29 Part tie rebar is based. found that it works and the steel cross-build is a security risk, has been ordered and built a half-day off.
  • 匿名
2013-05-23 12:24:58
The Part29 equipment foundation is binding the steel bar.Discovered its and the steel construction overlapping construction existence security hidden danger, already ordered the construction stop half of the day.
  • 匿名
2013-05-23 12:26:38
Part29 equipment Foundation is assembling reinforcement. Found it and cross steel structure construction for security breaches, has ordered construction stopped for a long time.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭