当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:静压沉桩未尽说明详见《建筑桩基技术规范》(JGJ 94-2008)有关技术要求与说明。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
静压沉桩未尽说明详见《建筑桩基技术规范》(JGJ 94-2008)有关技术要求与说明。
问题补充:

  • 匿名
2013-05-23 12:21:38
Static pressure pile deficiencies description see "Exploration Engineering" (jgj 94-2008) the relevant technical requirements and instructions.
  • 匿名
2013-05-23 12:23:18
Hydrostatic sunken piles are explained in the unfinished building pile specifications (JGJ 94 - 2008) the technical requirements and instructions.
  • 匿名
2013-05-23 12:24:58
The static pressure penetration of pile had not explained for details sees "Construction Pile foundation Technology standard" (JGJ 94-2008) the related specification and the explanation.
  • 匿名
2013-05-23 12:26:38
Static pressure pile to make are described in the technical code for building pile foundations (JGJ 94-2008) for technical requirements and instructions.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭