求翻译:沉桩结束后应编制桩位竣工图,并提交设计单位一份。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
沉桩结束后应编制桩位竣工图,并提交设计单位一份。
问题补充:

  • 匿名
2013-05-23 12:21:38
Pile after the end of the pile-built drawings shall be prepared and submitted to the design units a.
  • 匿名
2013-05-23 12:23:18
Sunken piles piles shall be prepared after the end bit, and built to a design unit.
  • 匿名
2013-05-23 12:24:58
After the penetration of pile had finished should establish the pile position completion chart, and submits designing department one.
  • 匿名
2013-05-23 12:26:38
Drawing on completion of sinking piles should be developed at the end, and design unit submitted a report.