当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:有关桩的制作、吊装、运输、接桩等施工过程中的要求遵照图集中的规定。制桩及打桩过程中,遇到异常情况及与地勘报告结果不符时,应及时与业主、设计单位、勘察单位联系,共同处理。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
有关桩的制作、吊装、运输、接桩等施工过程中的要求遵照图集中的规定。制桩及打桩过程中,遇到异常情况及与地勘报告结果不符时,应及时与业主、设计单位、勘察单位联系,共同处理。
问题补充:

  • 匿名
2013-05-23 12:21:38
Production of the pile, lifting, transportation, then the pile construction process requirements in accordance with the provisions of atlases. , The piles and the piling process, encounter anomalies and inconsistent with the geological survey report results with the owners, design units, contact the
  • 匿名
2013-05-23 12:23:18
The pile of production, lifting, transportation, access to piles in the course of construction, in accordance with the requirements of the concentration. A piling and piling process, abnormality and survey results of the report does not match with the owner should be timely, design, survey, common.
  • 匿名
2013-05-23 12:24:58
Related construction process and so on in pile manufacture, hoisting, transportation, pile extension request deference atlas stipulations.The system pile and cuts in line in the process, encounters the unusual situation and when compares the report result not symbol with the place, should promptly w
  • 匿名
2013-05-23 12:26:38
Production, lifting, transporting about piles, piles of construction requirement in accordance with provisions in a figure set. Piles and pile in the course of geological prospecting report results in the face of exceptional conditions and does not fit, contact owners, design units, reconnaissance u
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭