当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:针对现有设备线系统的结构、分布,以及将新增2#焊接设备线后的分布情况及状态,现有进出炉输送线结构及组成,已无法完成新设备线安装后,单一组装线对应双焊接线的生产工序排布状态,综合客户实际需求及现场布局,我们提出如下新输送系统的设计要求及达到目标是什么意思?

待解决 悬赏分:1 - 离问题结束还有
针对现有设备线系统的结构、分布,以及将新增2#焊接设备线后的分布情况及状态,现有进出炉输送线结构及组成,已无法完成新设备线安装后,单一组装线对应双焊接线的生产工序排布状态,综合客户实际需求及现场布局,我们提出如下新输送系统的设计要求及达到目标
问题补充:

  • 匿名
2013-05-23 12:21:38
For the structure of the existing equipment line system, distribution, and will be added to the distribution and status of # 2 welding equipment line, the current into the baked transmission line structure and composition, has been unable to complete the installation of new equipment line, a single
  • 匿名
2013-05-23 12:23:18
For an existing device-system structure, distribution, as well as the new 2 #welding equipment is the distribution and status of an existing entry and exit conveyor oven line structure and composition, has been unable to complete the new equipment lines after the installation, a single assembly line
  • 匿名
2013-05-23 12:24:58
In view of the existing equipment line system structure, the distribution, after as well as will increase the 2# welding apparatus line the distributed situation and the condition, existing will enter the drawing a charge transportation line structure and the composition, after has been unable to co
  • 匿名
2013-05-23 12:26:38
Structure and distribution of existing cable systems, as well as the new line of 2# welding equipment distribution and status, existing access to the furnace conveyor line structure and composition, after the device was unable to complete a new line installed, double welding line corresponding to a
  • 匿名
2013-05-23 12:28:18
正在翻译,请
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭