求翻译:Complete draft copies of the O & M manuals shall be submitted in triplicate, not less than three (3) months prior to the start of the Commissioning Tests for Unit 1 specified in Sub-Clause 20.60.1 to the Project Manager for approval. In the event that amendments or alterations to the draft manuals are required, the Con是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Complete draft copies of the O & M manuals shall be submitted in triplicate, not less than three (3) months prior to the start of the Commissioning Tests for Unit 1 specified in Sub-Clause 20.60.1 to the Project Manager for approval. In the event that amendments or alterations to the draft manuals are required, the Con
问题补充:

  • 匿名
2013-05-23 12:21:38
完整的O&M手册草案副本须提交一式三份,不批准的项目经理在子条款20.60.1指定为1号机组调试试验开始前不少于三(3)个月。草案手册的修订或更改所需的事件,承包人应当提交毫不拖延批准修改。
  • 匿名
2013-05-23 12:23:18
完成草稿副本o和m手册应提交在一九六八年四月,不小于三(3)个月事先进行测试,在开始的1号机组项目中指定20.60.1对于管理人员以供审批。 如果修改或变更所需的手册草案,承包者应毫不迟延地批准提交的订正草案。
  • 匿名
2013-05-23 12:24:58
肿瘤指南的完全草稿在一式三份,不少于三个(3个)月将递交在投入运行试验的开始之前为在从句1指定的单位20.60.1对项目负责人为获得批准。 在对草稿指南需要情况下校正或改变,承包商将递交修正为获得批准,不用延迟。
  • 匿名
2013-05-23 12:26:38
O 科技 M 手册的完成草案副本须提交一式三份,不得少于三个 3 月 1 号机组的调试测试开始前指定条款 20.60.1 到项目经理进行审批。在需修订或改动的草案手册,承建商应提交毫不迟延地批准的修订。
  • 匿名
2013-05-23 12:28:18
完整的汇票以 O 和 M 手册复制将在 triplicate 中被提交,不少于三 (3) 在对
 
 