当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在原液部第三车间任值班长一职,参于二期图纸审核、土建监造、设备安装,目前该项目正处于设备安装阶段。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在原液部第三车间任值班长一职,参于二期图纸审核、土建监造、设备安装,目前该项目正处于设备安装阶段。
问题补充:

  • 匿名
2013-05-23 12:21:38
Any duty one-third workshop of the liquid Ministry, the Senate reviewed the two drawings, construction supervision, equipment installation, the project is in the equipment installation phase.
  • 匿名
2013-05-23 12:23:18
In the original solution of the watch shop 3 Chief of Staff, 2 take part in the drawings, engineering and construction supervision, equipment installation, the project is now in the stage.
  • 匿名
2013-05-23 12:24:58
Is appointed value class leader in the original fluid department third engineer between a duty, participates in two issue of blueprint verifications, the construction jail makes, the equipment setup, at present this project is being at the equipment setup stage.
  • 匿名
2013-05-23 12:26:38
In the original post of third watch longest Executive Workshop, participation in phase II audit drawings, construction supervision, equipment installation, the project is currently in the device setup phase.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭