当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Contractor shall also furnish to the Project Manager one mylar polyester base full size reproducible of each as-built and other Drawing, which, in the opinion of the Project Manager, may be required for operation, maintenance, dismantling and reassembly, for identification of parts; and for ordering replacement par是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Contractor shall also furnish to the Project Manager one mylar polyester base full size reproducible of each as-built and other Drawing, which, in the opinion of the Project Manager, may be required for operation, maintenance, dismantling and reassembly, for identification of parts; and for ordering replacement par
问题补充:

  • 匿名
2013-05-23 12:21:38
承包商还应提供项目经理聚酯薄膜聚酯基全尺寸重现每个内置和其他绘图,其中,在项目经理的意见,可以操作所需,维修,拆解和重组,为鉴定部分;和订购更换部件和材料。麦拉应是0.1毫米厚,亚光膜双,washoff电影,前面印。
  • 匿名
2013-05-23 12:23:18
承包者还应向项目经理提供一个聚酯片聚酯基全尺寸可重现,每个构建的和另一个图,这在项目经理认为,可能需要的操作、维护、拆除和重新组装,用以识别零件;及订购替换部件和材料。 薄膜片应为0.1mm厚,双哑光胶片、washoff电影、印制在前。
  • 匿名
2013-05-23 12:24:58
承包商将也将装备到项目负责人一聚酯薄膜聚酯基地充分的大小可再生每张和被修造的和其他图画,根据项目负责人的观点,也许为操作,维护,折除和重新组装需要,为
  • 匿名
2013-05-23 12:26:38
承建商亦须于项目经理一个聚脂聚酯基全尺寸可重现的每个作为建和其他绘图中,其中的项目经理中,认为可能需要操作、 维护、 拆解和重组,识别的部分 ;和订购更换部件和材料。聚脂须 0.1 毫米厚,双哑光膜、 washoff 电影,印上前线。
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭