求翻译:8)2010年2月21日,菲律宾SAN JOSE(圣琼斯)500kV开关站设备交钥匙工程正式投入运行,。该项目于2009年6月16日签约,按照合同约定。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
8)2010年2月21日,菲律宾SAN JOSE(圣琼斯)500kV开关站设备交钥匙工程正式投入运行,。该项目于2009年6月16日签约,按照合同约定。
问题补充:

  • 匿名
2013-05-23 12:21:38
8) February 21, 2010, the Philippines, san jose (San Jose) 500kv switching station equipment turnkey officially put into operation, The project was signed on June 16, 2009, in accordance with the contract.
  • 匿名
2013-05-23 12:23:18
8) February 21, 2010, Philippines SAN JOSE (Saint Jones) 500 kV switch station equipment to turnkey projects, formally put into operation. The project was June 16, 2009 contract, in accordance with agreed in the contract.
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
8) on February 21, 2010, SAN JOSE in the Philippines (Jones) 500kV switch station equipment turnkey project was put into operation. The project signed on June 16, 2009, in accordance with the contract.