当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:施工人员来酒店接管区域施工前,必须向工程部提交经筹建处批核的施工单位进入前的档案,包括施工单位基本资料(注册许可证,单位负责人个人详细资料及照片),施工人员名单的详细资料(包括身份证复印件,所属单位、工种等),紧急情况联系人姓名、24小时直通电话,经工程部审核后,到保安部办理临时出入证。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
施工人员来酒店接管区域施工前,必须向工程部提交经筹建处批核的施工单位进入前的档案,包括施工单位基本资料(注册许可证,单位负责人个人详细资料及照片),施工人员名单的详细资料(包括身份证复印件,所属单位、工种等),紧急情况联系人姓名、24小时直通电话,经工程部审核后,到保安部办理临时出入证。
问题补充:

  • 匿名
2013-05-23 12:21:38
Construction workers to the hotel to take over the regional construction must be submitted to the file into the top of the construction unit approved by the Preparatory Office to the Engineering Department, including the construction of the basic unit of information (registration license, the person
  • 匿名
2013-05-23 12:23:18
Construction personnel to take over the area before the construction, it must be submitted to the engineering department by the Planning Department approval before entering the construction unit of the archives, including basic information on construction units (license registration, head of unit pe
  • 匿名
2013-05-23 12:24:58
The constructor comes the hotel to take over control before the region construction, must enter front toward the engineering dept submission after the construction place batch of nuclear construction the file, including the construction basic document (registration permit,%2
  • 匿名
2013-05-23 12:26:38
Construction personnel to hotel took over regional construction Qian, must to Engineering Department submitted by preparation Department batch nuclear of construction units entered Qian of archives, including construction units basic information (registered license, units head personal detailed info
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭