求翻译:电厂升压站不在本次投标设计范围内,以变压器低压侧套管为分界点。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
电厂升压站不在本次投标设计范围内,以变压器低压侧套管为分界点。
问题补充:

  • 匿名
2013-05-23 12:21:38
Plant booster station is not in the tenders for the design within the casing of the transformer low voltage side for the cut-off point.
  • 匿名
2013-05-23 12:23:18
Power Plants boost site are not covered by this tender design range, low-voltage side to transformer is the demarcation point.
  • 匿名
2013-05-23 12:24:58
The power plant booster station in this bid design scope, take the transformer low pressure side drive pipe as a threshold.
  • 匿名
2013-05-23 12:26:38
Booster stations is not within the scope of this tender design of power plant, transformer low voltage side sleeve for the boundary point.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 