- 匿名

|
关注:1
2013-05-23 12:21
求翻译:Generally it would take 15 work days for getting the permission. At the same time, the Beijing agent need to go to the artist studio for measuring size of needed crates and then decide how to proceed in detail (including how to fit the container properly), then build the crates accordingly是什么意思?
待解决
悬赏分:1
- 离问题结束还有
Generally it would take 15 work days for getting the permission. At the same time, the Beijing agent need to go to the artist studio for measuring size of needed crates and then decide how to proceed in detail (including how to fit the container properly), then build the crates accordingly
问题补充:
 
|