当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:由浇铸跨(27m)、切割跨(27m)、过渡跨(30m)、出坯跨(30m)组成。主控楼是什么意思?

待解决 悬赏分:1 - 离问题结束还有
由浇铸跨(27m)、切割跨(27m)、过渡跨(30m)、出坯跨(30m)组成。主控楼
问题补充:

  • 匿名
2013-05-23 12:21:38
By the casting across (27m), cutting cross (27m), the transition cross (30m), the billet cross composed of (30m). Control building
  • 匿名
2013-05-23 12:23:18
By casting across (27 M), cutting across (27 M), transition (30 m) across, and a rough cross- (30M). Master Floor
  • 匿名
2013-05-23 12:24:58
By the casting cross (27m), cuts cross (27m), transits cross (30m), the semifinished product cross (30m) is composed.Master control building
  • 匿名
2013-05-23 12:26:38
By casting a cross (27m), cutting across (27m), transition cross (30m), knockout Cross (30m). The main control building
  • 匿名
2013-05-23 12:28:18
cast by cross- (27M), cutting across (27 M), transition (30 m) across, and a rough cross- (30M). Master Floor;
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭