当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:曾在贵州格里桥水电站、甘肃达板水电站等许多电站担任常驻工地代表,现在越南占化水电站担任常驻工地代表。对工地现场安装、试验、试运行指导及各方面的协调工作有着丰富的经验。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
曾在贵州格里桥水电站、甘肃达板水电站等许多电站担任常驻工地代表,现在越南占化水电站担任常驻工地代表。对工地现场安装、试验、试运行指导及各方面的协调工作有着丰富的经验。
问题补充:

  • 匿名
2013-05-23 12:21:38
In Bridge Hydropower Station in Guizhou Gerry, Gansu up to board the hydroelectric power plants. Power station as a permanent site representative, and Vietnam accounted for hydropower station as a permanent site representative. Coordination has extensive experience of site-site installation, testing
  • 匿名
2013-05-23 12:23:18
In Guizhou Maghreb bridge hydroelectric power stations, hydro-electric power station, and Gansu province up to plate as many power plants, is now the permanent site on behalf of Vietnam as the permanent site of hydroelectric power stations. On-site installation, testing, commissioning and the coordi
  • 匿名
2013-05-23 12:24:58
Once in the Guizhou Gerry bridge hydroelectric power station, Gansu reached the board hydroelectric power station and so on many power plant assumption resident work site representative, now Vietnam occupies hydroelectric power station assumption resident work site representative.To the work site sc
  • 匿名
2013-05-23 12:26:38
In Guizhou in the hydropower station, hydropower station in Gansu province and many power stations serving as Permanent Representative to the site, now Viet Nam of the hydropower stations serving as Permanent Representative to the site. Guidance on site installation, testing, commissioning and coord
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭