当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:第一代编织机的电气系统需要全部更新,增加PLC、电柜及触模屏(HMI),外围线路全部更换控制电缆。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
第一代编织机的电气系统需要全部更新,增加PLC、电柜及触模屏(HMI),外围线路全部更换控制电缆。
问题补充:

  • 匿名
2013-05-23 12:21:38
To be completely updated the electrical system of the first generation of weaving machines, increase plc, panels and touch screen (hmi), all the external lines to replace the control cable.
  • 匿名
2013-05-23 12:23:18
The first generation of weaving machine electrical system needs to be updated to add all PLC, cabinet, and touch screen (HMI), peripheral lines replace all control cables.
  • 匿名
2013-05-23 12:24:58
The first generation of braiding machine electrical system needs to renew completely, increases PLC, the electricity cabinet and touches mold screen (HMI), the periphery line replaces the control cable completely.
  • 匿名
2013-05-23 12:26:38
Electrical systems need to update all of the first generation machine, increasing PLC, Cabinet and Tablet mode screen (HMI), perimeter lines replace all control cables.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭