当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在施工基础和下部构造时,施工的顺序按照架梁的次序进行。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在施工基础和下部构造时,施工的顺序按照架梁的次序进行。
问题补充:

  • 匿名
2013-05-23 12:21:38
In the lower part of the foundation and structure construction, the construction of the girder according to the order of the order.
  • 匿名
2013-05-23 12:23:18
In constructing the foundation and the Ministry of Construction, construction sequence structure in accordance with the order Leung.
  • 匿名
2013-05-23 12:24:58
When construction foundation and down structure, the construction order defers to Liang's order to carry on.
  • 匿名
2013-05-23 12:26:38
At the time of construction Foundation and infrastructure, construction of the order, in accordance with the beam of the order.
  • 匿名
2013-05-23 12:28:18
In the lower part of the foundation and structure construction, the construction of the girder according to the order of the order.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭