当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:起点3岔口(巴蒙)提议设计为环岛,1C公路方向要求自环岛出去至少修筑20米,去琅勃拉邦方向则要求铺筑至桥头且路面宽度等同于现路面宽度,并包含人行道和排水系统及路灯设施。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
起点3岔口(巴蒙)提议设计为环岛,1C公路方向要求自环岛出去至少修筑20米,去琅勃拉邦方向则要求铺筑至桥头且路面宽度等同于现路面宽度,并包含人行道和排水系统及路灯设施。
问题补充:

  • 匿名
2013-05-23 12:21:38
The starting point 3 fork (Bameng), proposed the design for the island 1c road direction calls for the construction of at least 20 meters out from the island to Luang Prabang direction require the paving to the bridgehead and the road width is equal to the current width of the road, and includes sid
  • 匿名
2013-05-23 12:23:18
Start 3 Montevideo (Crossroad) of the proposed design for the ring, 1 Island C road direction around the island for construction at least 20 meters away, and went to Luang Prabang for paving the way to bridge and road width is equal to the current road width, and includes sidewalks and drainage and
  • 匿名
2013-05-23 12:24:58
The beginning 3 road forks (the Pakistan Mongolia) proposed the design is the rotary island, the 1C road direction request exits from the rotary island to construct 20 meters at least, goes to the jade to pull the nation direction to request suddenly to lay to the bridge head also the surface width
  • 匿名
2013-05-23 12:26:38
Starting point 3 fork (Bamond) proposed design for the island, 1C highway direction requirements since the island went out to build at least 20 meters, to Luang Prabang direction requires paving to the bridge and pavement width equivalent to pavement widths, and include sidewalks and street lighting
  • 匿名
2013-05-23 12:28:18
.3 (Crossroad) of the proposed design, island1 C road direction out around the island for at least 20 meters, built to Luang Prabang for paving the way to bridge and road width is equal to the current road width, and includes sidewalks and drainage and lighting facilities. ;
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭