当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:关系到当地村民通行或灌溉的通道小桥可提前安排施工,保证在本项目的施工过程中不影响当地村民的生产与生活。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
关系到当地村民通行或灌溉的通道小桥可提前安排施工,保证在本项目的施工过程中不影响当地村民的生产与生活。
问题补充:

  • 匿名
2013-05-23 12:21:38
Related to the prevailing local villagers or irrigation channel construction of the bridge can be arranged in advance to ensure that this project does not affect the construction process of production and life of local villagers.
  • 匿名
2013-05-23 12:23:18
The local villagers' access or irrigation of access arrangements may advance the bridge construction project, and to ensure that in the course of construction of the local villagers do not affect the production and living.
  • 匿名
2013-05-23 12:24:58
Relates the local villagers to pass through or the irrigation channel bridge may arrange the construction ahead of time, guaranteed does not affect the local villagers' production and the life in this project construction process.
  • 匿名
2013-05-23 12:26:38
Related to traffic or irrigation channel of local villagers bridges can be scheduled in advance of construction to ensure that the construction of the project without affecting the production and local villagers living in the process.
  • 匿名
2013-05-23 12:28:18
Related to the prevailing local villagers or irrigation channel construction of the bridge can be arranged in advance to ensure that this project does not affect the construction process of production and life of local villagers.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭