求翻译:由于供应商呆滞近2000根06J971595G线束库存,而线束同发动机控制器需要配套使用的,因此该呆滞唯一的消耗是增加TIGUAN 1.8T AT车型C4配置的生产计划数量,请销售协商调整。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
由于供应商呆滞近2000根06J971595G线束库存,而线束同发动机控制器需要配套使用的,因此该呆滞唯一的消耗是增加TIGUAN 1.8T AT车型C4配置的生产计划数量,请销售协商调整。
问题补充:

  • 匿名
2013-05-23 12:21:38
Due the supplier sluggish 2000 06j971595g harness inventory, while the harness supporting the use of the same engine controller, so the sluggish only consumption is to increase the number of models of tiguan 1.8t at c4 configuration of the production plan, sales negotiation to adjust.
  • 匿名
2013-05-23 12:23:18
Since the supplier was subdued in 2000 971,595 G J root 06 harness inventory, and harness the engine controller needs, so that only one of the sluggish consumption is increased 1.8 T TIGUAN AT C4 configuration in the production plan, sales consultation.
  • 匿名
2013-05-23 12:24:58
As a result of supplier delay near 2000 06J971595G group of lines stock, but the group of lines needs to form a complete set the use with the engine controller, therefore this delay only consumption is increases TIGUAN 1.8T AT the vehicle C4 disposition productive plan quantity, please sell consults
  • 匿名
2013-05-23 12:26:38
Due to vendor nearly 2000 roots 06J971595G wiring harness to the sluggish inventory, and wiring harness with the engine supporting the use of controllers need, only consumption is increasing, therefore the sluggish TIGUAN 1.8T number of production plans AT model C4 configuration, please consult sale
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 