当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:A “Field Test Plan” – FTP, to demonstrate the adequacy of the equipment to all predicted operational conditions and correlated parameters, shall be submitted to CBMM 30 (thirty) days prior the equipment factory testing and shall comprise, at least, the tests described in the “Field Test Plan是什么意思?

待解决 悬赏分:1 - 离问题结束还有
A “Field Test Plan” – FTP, to demonstrate the adequacy of the equipment to all predicted operational conditions and correlated parameters, shall be submitted to CBMM 30 (thirty) days prior the equipment factory testing and shall comprise, at least, the tests described in the “Field Test Plan
问题补充:

  • 匿名
2013-05-23 12:21:38
“田间试验计划” - FTP,表现出充足的设备,所有预测的经营条件和相关参数,应提交CBMM 30(30)前设备厂测试天,并应包括,至少测试描述在“田间试验计划
  • 匿名
2013-05-23 12:23:18
一个“现场测试计划”-ftp,表现出足够的设备,以预测的所有业务条件和相关参数,均须提交cbmm30(三十)天的设备厂测试之前并应包括,至少,在测试中所述的“字段测试计划
  • 匿名
2013-05-23 12:24:58
“实地试验计划” - FTP,给所有被预言的工作状态和被关联的参量展示设备的充足,将递交给预先CBMM 30 (三十)天设备工厂试验和包括,在“实地试验计划描述的至少测试
  • 匿名
2013-05-23 12:26:38
"字段测试计划"— — FTP,表现出足够的设备都预测业务条件与相关的参数,须呈交 (三十岁) 的 CBMM 30 天事先设备厂试验,并应至少包括"字段测试计划中介绍的测试
  • 匿名
2013-05-23 12:28:18
一个“现场试验计划” - ftp,显示对于所有被预测的运算条件的设备的充足和使参数相互关联,将被提交给 CBMM 30( 三十 ) 日以前设备工厂测试和将包含,至少,测试在“现场试验计划中描述 ”
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭