当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Because utilities must base their power delivery potential on anticipated peak uses, they attempt to reduce the magnitude of those peaks through demand charges and differential billing rates, in which the price charged for electricity is substantially higher during peak-demand periods than during off-peak hours.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Because utilities must base their power delivery potential on anticipated peak uses, they attempt to reduce the magnitude of those peaks through demand charges and differential billing rates, in which the price charged for electricity is substantially higher during peak-demand periods than during off-peak hours.
问题补充:

  • 匿名
2013-05-23 12:21:38
因为事业必须根据他们的权力预期峰值用途交付的潜力,他们试图减少幅度在电力收费的价格是在需求高峰时期大幅高于非高峰期间需求收费和结算利率差,通过这些山峰小时。
  • 匿名
2013-05-23 12:23:18
因为实用程序必须根据预期的高峰电力的输送潜力的使用,它们就会试图通过减少的严重的高峰需求,差速器收费费率,在这种的收费价格大大高于电力是在繁忙时间,相比需求在非高峰期。
  • 匿名
2013-05-23 12:24:58
由于公共事业必须根据他们的功率传输潜力被期望的高峰用途,他们试图通过需求充电减少巨大那些峰顶在正常小时,并且有差别的票据利率,在期间对于电收费的价格是极大地高峰顶要求期间比。
  • 匿名
2013-05-23 12:26:38
因为实用程序必须基于其权力交付潜力预期的高峰使用,他们试图减少这些山峰通过需求收费和鉴别计费费率收取的电力的价格在大幅上升期间峰值需求比高峰期的规模。
  • 匿名
2013-05-23 12:28:18
因为设施在预期高峰使用必须设立他们的力量发送潜力,他们尝试通过需求减少那些顶峰的重要性收费和不同的记帐费率,其中为电被收的价格在高峰需求时期期间是重要
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭