求翻译:准备工作:在接头坑位置搭设帐篷,检查接续工具材料,把光缆引入帐篷。清理接头坑做好余留。支好工作台,将两端光缆外护层清洗干净,固定在工作台上。将两端光缆的端头用断线钳各剪掉50cm左右。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
准备工作:在接头坑位置搭设帐篷,检查接续工具材料,把光缆引入帐篷。清理接头坑做好余留。支好工作台,将两端光缆外护层清洗干净,固定在工作台上。将两端光缆的端头用断线钳各剪掉50cm左右。
问题补充:

  • 匿名
2013-05-23 12:21:38
Preparatory work: the location of the connector pit erection of tents, check the continuation of tools and materials, fiber optic cables into the tent. Cleanup connectors pit do I stay. Support a good table, and both ends of the fiber optic cable sheath cleaned, fixed on a workbench. Both ends of th
  • 匿名
2013-05-23 12:23:18
Preparation: into a connector hang position making tents, check presentation tool materials, fiber optic cable into the tent. Cleaning up to do a good job fitting graves remaining. Support good work desk, the two end-fiber optic cable outer jacket clean, fixed on a work bench. The two ends of the fi
  • 匿名
2013-05-23 12:24:58
Preparatory work: Puts up the tent in the attachment pit position, the inspection connection tool material, optical cable introduction tent.The cleaning up attachment pit completes remains.A good work table, the armor coat clean is clean the both sides optical cable outside, fixes on the work table.
  • 匿名
2013-05-23 12:26:38
Ready to work: putting up tents in the connector location, check next tool materials, the cable introduces tent. Hang the remaining cleanup joints. Support good work, optical cable outer sheath cleaning clean on both ends, fixed to the bench. End of the cable at both ends with a bolt cutter to cut o
  • 匿名
2013-05-23 12:28:18