当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:1. The waste heat recovery system from the CDA will reduced energy in both the reheat of the AC systems and the heating of the domestic hot water system by about 40%, the pay back period is estimated to be less ten 0.7 years. Total cost about RMB380,000.00.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
1. The waste heat recovery system from the CDA will reduced energy in both the reheat of the AC systems and the heating of the domestic hot water system by about 40%, the pay back period is estimated to be less ten 0.7 years. Total cost about RMB380,000.00.
问题补充:

  • 匿名
2013-05-23 12:21:38
1。从CDA余热回收系统,将减少在再热的交流系统和加热约40%的生活热水系统的能源回收期估计要少100.7年。总成本约380元,000.00。
  • 匿名
2013-05-23 12:23:18
1.*的废热回收系统的综合发展将减少能源的再加热的加热后的交流电系统和家庭热水系统约40%,时间估计低100.7年。 rmb380,000.00总成本约。
  • 匿名
2013-05-23 12:24:58
1. 废热补救系统从CDA意志在AC系统的再热减少了能量,并且国内热水系统的热化大约40%,薪水期间估计是十0.7年。 总成本关于RMB380,000.00。
  • 匿名
2013-05-23 12:26:38
1.废热回收系统的综合发展区将减少能源的交流系统的两个热和加热的 40%左右,付薪背期间生活热水系统预计可少十 0.7 年。总成本约 RMB380,000.00。
  • 匿名
2013-05-23 12:28:18
1.来自 CDA 的废弃的热度恢复系统希望通过两个都减少能量重新加热 AC 系统中和由大约 40% 所作的国内热水系统的加热,偿还时期被估计是更少十 0.7 年。关于 RMB380,000.00 的总成本。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭