当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:采用计算机辅助设计、制图、管理, 年可完成3~4种机型的水力发电设备的设计、工艺技术前期准备工作。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
采用计算机辅助设计、制图、管理, 年可完成3~4种机型的水力发电设备的设计、工艺技术前期准备工作。
问题补充:

  • 匿名
2013-05-23 12:21:38
Computer-aided design, drafting, management, and to be completed in three to four kinds of models of hydroelectric equipment design, process technology preparatory work.
  • 匿名
2013-05-23 12:23:18
Using computer-aided design, graphic design, management, and can be completed in 3 to 4 types of hydroelectric equipment design, process technology early preparations.
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
Using computer-aided design, mapping, management, years to complete the 3~4 model of hydroelectric power equipment design and technology preparatory work.
  • 匿名
2013-05-23 12:28:18
Uses the computer-aided design, the charting, the management, the year may complete 3~4 types the water power plant design, the processing technology earlier period preparatory work.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭