当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:施颖,唐苍松,宣纪明,吕颖钊.混凝土箱梁腹板竖向预应力分析.桥梁建设.2006(1):8-11.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
施颖,唐苍松,宣纪明,吕颖钊.混凝土箱梁腹板竖向预应力分析.桥梁建设.2006(1):8-11.
问题补充:

  • 匿名
2013-05-23 12:21:38
Shi Ying, Tang pines Xuanji Ming Lv Ying-chiu. Concrete box girder webs vertical prestressing. Bridge Construction 2006 (1) :8-11.
  • 匿名
2013-05-23 12:23:18
Gerhard Schroeder, Mr Henry Tang Ying-sun, and also the discipline that Lu Ying, such as concrete box girders . Vertical abdominal board to prestressed bridge-building analysis .2,006 . (1): 8-11.
  • 匿名
2013-05-23 12:24:58
Executes Ying, Tang Cangsong, proclaims the discipline to be bright, Lu Yingzhao. Concrete box Liang web plate vertical pre-stressed analysis. The bridge constructs .2006(1):8-11.
  • 匿名
2013-05-23 12:26:38
Shi Ying, Don pines, Xuan Jiming, Lv Yingzhao. webs of concrete box girder of vertical prestress analysis. bridge construction. 2006 (1): 8-11.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭