当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:2010年4月至今参与SNATLONALOILWELL C033浮吊项目扒杆,转塔,滑轮组;装配及轨道安装工作是什么意思?

待解决 悬赏分:1 - 离问题结束还有
2010年4月至今参与SNATLONALOILWELL C033浮吊项目扒杆,转塔,滑轮组;装配及轨道安装工作
问题补充:

  • 匿名
2013-05-23 12:21:38
April 2010 the project has involved SNATLONALOILWELL C033 floating crane derrick, turret, pulley blocks; assembly and installation of the track
  • 匿名
2013-05-23 12:23:18
April 2010 has so far involved in SNATLONALOILWELL C par 033 floating crane project seeks to tap, pivots, assembling and installation work.
  • 匿名
2013-05-23 12:24:58
In April, 2010 until now participates in SNATLONALOILWELL the C033 derrick barge project digging up the pole, the turret, the block and tackle; Assembly and track erection work
  • 匿名
2013-05-23 12:26:38
April 2010-present participation in SNATLONALOILWELL C033 floating crane project Derrick, turret and pulleys; assemble and track installation work
  • 匿名
2013-05-23 12:28:18
April 2010 the project has involved SNATLONALOILWELL C033 floating crane derrick, turret, pulley blocks; assembly and installation of the track
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭