当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:   沼气电厂一期建设5台3MW机组,其中2台接入厂内10kV母线I段,3台接入厂内10kV母线II段。运行时,II段母线上一台机组作为备用,其余4台投入运行。二期建成后,每4台机组接入一段10kV母线。运行时,II段母线上一台机组作为备用,其余7台投入运行。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
   沼气电厂一期建设5台3MW机组,其中2台接入厂内10kV母线I段,3台接入厂内10kV母线II段。运行时,II段母线上一台机组作为备用,其余4台投入运行。二期建成后,每4台机组接入一段10kV母线。运行时,II段母线上一台机组作为备用,其余7台投入运行。
问题补充:

  • 匿名
2013-05-23 12:21:38
A biogas power plant construction five 3mw unit, access factory 10kv bus i access factory 10kv bus ii. Runtime, ii segment bus unit as a backup, the remaining four units in operation. After the completion of the two, every four units access section of 10kv bus. Runtime, ii segment bus unit as a back
  • 匿名
2013-05-23 12:23:18
A biogas plant construction MW units 5, 3, 2 to 10 in the factory I kV bus, 3 desktop access plant kV bus II in paragraph 10. Run-time, on a bus II paragraph units as an alternative, the remaining 4 units in operation. Phase 2 is completed, each 4 units Access A 10 kV bus. Run-time, on a bus II para
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
Biogas power plant construction with a 5 sets of units, of which paragraph 2 sets of 10kV in the access factory bus I, 3 set access factory 10kV bus II. At run time, paragraphs II a unit on the bus as an alternative, the remaining 4 and put into operation. Following completion of the second phase, e
  • 匿名
2013-05-23 12:28:18
A methane power plant issue constructs 5 3MW units, in 2 turning on factory 10kV generatrix I section, in 3 turning on factories 10kV generatrix II section.When movement, in II section of generatrixes a unit takes spare, other 4 investment movement.After two issues complete, every 4 units turn on a
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭